![](https://nhohonduras.org/wp-content/uploads/2021/02/2008.png)
2008 - Construction in progress!
At this point we had finished building phase #1 which consisted of 3 classrooms along with a welding shop outside of the main building. The seminars for teachers continued, and Hope Vocational Technical Institute was inaugurated with three different classes.Ā